Skip to main contentScroll Top

National Loon Center Takes Shape as Mass Timber Installation Advances

national-loon-center-takes-shape-as-mass-timber-installation-advances

After years of planning, design, collaboration, and anticipation, the National Loon Center is reaching another exciting milestone in Crosslake as its mass timber structure continues to rise.

For those who have followed the project from its earliest stages, seeing the building take shape is a rewarding reminder of just how much work, innovation, and teamwork have gone into creating what will become a one-of-a-kind destination dedicated to education, conservation, and Minnesota’s iconic state bird.

In the video below, Jeff Morberg, Superintendent with Kinsol Timber Systems, shares his perspective from the construction site and explains what makes this project unlike any other.

While many mass timber buildings rely on repetitive designs and structural layouts, Jeff notes that the National Loon Center stands apart because of its unique geometry and architectural character.

“The National Loon Center project is very unique compared to the traditional mass timber builds,” Jeff said. “This one has so much interesting geometry, and it’s going to be gorgeous. There are so many interesting spaces in there.”

Widseth has been involved with the National Loon Center for many years, helping guide the project through planning, design, and development. One of the most exciting evolutions along the way was the transition to a mass timber structure, which now defines the building’s identity and visitor experience.

Mass timber construction combines sustainability with remarkable precision. Using cross-laminated timber (CLT) panels and glulam beams, large structural components are manufactured off-site and delivered ready for installation. The result is a building system that comes together efficiently while showcasing the beauty of exposed wood throughout the finished structure.

National Loon Center Crosslake MN 2026 PCon 20

Jeff has spent years working on mass timber projects across North America, but says the level of precision still amazes him.

“When I first got into it, I didn’t believe it,” he said. “Years later it continues to amaze me. We’re talking about millimeters or sixteenths or thirty-seconds of tolerance, and it never fails. It’s always so precise and goes together so well.”

That precision is the result of extensive coordination among project partners. Jeff emphasized that while Kinsol Timber Systems is responsible for installing the timber components, the project’s success reflects the contributions of many teams working together.

Nor-Son Construction has led construction efforts as general contractor, coordinating the many moving parts required to bring the project to life. Cornerstone Timberframes has partnered on the timber installation and fabrication of the glulam components, while Nordic supplied and manufactured the CLT panels.

For the Widseth team, this stage of construction is especially meaningful. After years of collaboration with project partners, stakeholders, and the National Loon Center organization, it is exciting to see the design become reality.

And for Jeff, like many involved in the project, there’s one thing he’s looking forward to most.

“I’m looking forward to seeing the finished product and getting it topped off.”

We’re proud to continue supporting this landmark project and look forward to sharing more construction updates as the National Loon Center moves closer to completion.

Search Archives

Newsletter Sign Up

Recent Posts